The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price

  • Audited Supplier
  • 19 yrs

Contact Supplier

Product Highlights

  • Imported Main Motor: Main motor imported from Korea ensures high reliability and durability.
  • High-Strength Materials: Key parts made of high strength stainless steel with heat treatment process.
  • Stainless Steel Mixer: Adopts stainless steel straight line flow mixer for small working resistance and no leakage.
  • 100% Quality Inspection: Every machine undergoes 100% quality examination and test before shipment.
  • ISO and CE Certified: All machines meet ISO and CE certification standards for safety and quality.
  • 1-Year Warranty: Provides 12 months warranty coverage for all mechanical equipment.
  • Professional Technical Support: Free problem solving during warranty and professional support team after warranty.
  • Flexible Delivery Time: Shipment within 5 days if in stock, generally 15 days for production.

Product Images of The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price

The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price pictures & photos
The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price pictures & photos
The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price pictures & photos
The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price pictures & photos
The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price pictures & photos
The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price pictures & photos
The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
  • The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
    The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
  • The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
    The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
  • The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
    The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
  • The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
    The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
  • The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
    The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
  • The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
    The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price

Find Similar Products

Product Description

Company Profile
 
The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low PriceChallenge, face the challenge positively!In order to provide customers with the most professional and thoughtful service and products, hengdi is notafraid of any challenge!
Yue feng always insists:We can provide customers with the most professional products, to this end, unremitting efforts!
The purpose of cooperation is win-win!
With the common growth of customers, growing and growing!
Yue feng  is your wise choice!We believe that you have the foresight and vision to affirm the brand power of hengdi "Yuefeng as the fan" andthe brand concept of "quality makes the future", Hengdi is your wise choice!
ABOUT YUEFENGMACHINE
YUEFENGl machine founded in 2003, it is a high-quality enterprise with mechanical automation and inteligent solutionsfor insulating glass deep processing industry. At present, Hengdi Machinery has more than 100 employees, and itsbusiness covers more than 170 countries and regions at home and abroad, serving more than 10,000 customersOver the years, we have been adhering to the business philosophy of "quality-oriented, service first", constantlyinnovating and concentrating on conquering the cutting-edge technology of the industry, improving the overalllevel of the industry, and making China "smart" insulating glass equipment go global, "Perseverance for a long timeenlightenment for the future", Hengdi Machinery is wiling to join hands with customers and friends from all walks oflife to create brilliance and strive to improve service level. We are always on the road!


The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
 We focus on product innovation and research and development, the company set up r&d center, specializing in basic andorward-looking technology research and development, achieve rapid product upgrades, broaden the product areas, topuild the core competence of enterprises sustainable development.In order to do a good job, one must first benefit the machine. first-class products must come from first-class processingequipment and concepts. The use of industry-leading digital, fine precision machining equipment, to ensure that theompany's products to achieve "smart design, precision manufacturing.
The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
In order to better provide marketing and sales activities for our partners, and promote the development of insulating glassindustry spare no effort. The exhibition will continue to innovate and successfully participate in many exhibitions in manycities across the country. During the exhibition, the exhibition has been highly concered by industry leaders and userswhich has laid a solid foundation for enterprises in brand building, in the future, we will continue to work hard to provideinnovative power for the industry and grow together with the industry.
Product Description

The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price

Detailed Photos

The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price

Product Parameters
The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
Technical Parameter
Model ST03
Mixing ratio 10:1~14:1
Base drum 55 gallons (200L)
Curing agent barrel 5 gallons (20L)
Maximum air consumption 0.5m³/min
Maximum squeeze pressure 20MPa
Overall dimension 1200x1100x2500mm
 weight 600kg
The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
The manufacturer sells the latest two-component coating machine in 2024 at a low price
+ The main motor imported from Korea and thekey parts are made of high strength and highquality stainless steel through heat treatmentprocess, which greatly improves the reliability anddurability of the two-component glue coatingmachine and ensures the excellent quality of theequipment.
+ Adopt stainless steel straight line flow mixer, smallworking resistance, big amount of glue, save glue,no glue leakage, and the light weight.
 
 

 
More Product Display

The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
 
The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
 
 
The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
 
 
The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
 
 
The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
 
 
 
 
 
Our Advantages

The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price

The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low PriceThe Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price
The Manufacturer Sells The Latest Two-Component Coating Machine in 2024 at a Low Price


1.Are your company a trading one or a factory? 
Factory + trade (integration), 35 years' focusing on Upvc,Aluminum Window and Doors Equipment ,insulating
glass equipment and curtain wall equipment.


2.After an order is placed, when to deliver?
Generally about 15 days, If we have inventory, we can arrange shipment within 5 days.
Please be aware that our production lead times depend on specific items and item quantities.


3.What about the warranty with after - sales services?
12 months warranty. Besides,we can help you to solve your problem freely;
After the warranty,the professional after-sale service team will provide perfect technical support,and help customers solve problems ,encountered while using our products.Handles guest problems and complaints in a professional and timely.


4.What about the services and product' quality?
Each machine must be carried out 100% quality examination and test before shipment.
And all machines meet ISO and CE certification.


5. We don't know the machine operation, what should we do?
We can send engineer to your place, or we provide video training to show you how to install & operate, let engineer help you online.

 

 

https://maichencnc.en.made-in-china.com/product-list-1.html

About the Supplier

This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASI265867". Items marked "verified" are certified.

Watch Video
Watch Video
Jinan Changhong International Co., Ltd.
Jinan Changhong International Co., Ltd.
Jinan Changhong International Co., Ltd.
Jinan Changhong International Co., Ltd.
Jinan Changhong International Co., Ltd.
Jinan Changhong International Co., Ltd.
Jinan Changhong International Co., Ltd.
Jinan Changhong International Co., Ltd.

About Our Factory & Business Background

Address
No. 2504, Binhe Business Center, 8888 North Qinghe Road, Beiyuan Subdistrict, Tianqiao District, Jinan City, Shandong Province
verified Terms of Payment
LC, T/T
verified International Commercial Terms(Incoterms)
FOB, CIF
verified Average Lead Time
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: one month
verified Nearest Port
Qingdao Port
verified Minimum Order Quantity
1 Set
verified Supply Chain Partners
3

Our Production Capability & Technical Expertise

Main Products
Window and Door Processing Machine, PVC Machine, Aluminum Machine, Insulating Glass Machine
verified QA/QC inspectors
1 people
verified Inspection Type for Finished Products
100% inspection(Visual inspection)
verified Inspection Method for Finished Products
Finished product checked by packing staff
verified Customization Options
Customization from Samples, Customization from Designs, Full Customization, Minor Customization, Flexible customization
verified R&D Engineers
1 people
verified Traceability of Raw Materials
No

Our Industry Experience & Global Business Record

verified Export Year
10 Years
verified Main Markets
North America, South America
verified Number of Foreign Trading Staff
8
verified Overseas Agent/Branch
No
verified New Products Launched in Last year
Yes

FAQ

Are you a trading company or a factory?
We are a factory plus trade integration, focusing on UPVC, Aluminum Window and Doors Equipment, insulating glass equipment and curtain wall equipment for 35 years.
What is the delivery time after placing an order?
Generally about 15 days. If we have inventory, we can arrange shipment within 5 days. Production lead times depend on specific items and quantities.
What is the warranty period and after-sales service?
We provide 12 months warranty. We help solve problems freely during warranty. After warranty, the professional team provides perfect technical support and handles complaints professionally.
How do you ensure product quality?
Each machine undergoes 100% quality examination and test before shipment. All machines meet ISO and CE certification.
What if we do not know how to operate the machine?
We can send an engineer to your place, or provide video training for installation and operation. Engineers can also help online.
What is the minimum order quantity?
The minimum order quantity is 1 set.
What are the payment terms?
We accept LC and T/T payment terms.
What is the average lead time?
Peak season lead time is within 15 workdays, and off-season lead time is one month.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now